By Sebastian Grabowski, DC Fire & Security, Luton. Updated October 2026.
Once a week, at the same time, operate one manual call point with its test key and check the alarm sounds. Use a different call point each week. Warn everyone in the building first, then reset the panel and write the result in the fire alarm logbook. A competent engineer should also service the system about every 6 months. This page covers commercial and communal alarms under BS 5839-1.
It takes about five minutes. The person doing it needs to know the panel and the building.
If you want the short version, see how to do a weekly fire alarm test. For testing frequency across the whole system, see how often should a fire alarm be tested. This page goes further on the record, faults and monitoring.
Print this, put it in the logbook or pin it by the panel.
| Week / date | Time | Call point tested (number and place) | Zone shown on panel | Sounders heard (Y/N) | Fault or action | Tested by (sign) |
|---|---|---|---|---|---|---|
| 1 / ____ | ____ | CP01 Reception | ____ | Y / N | ____ | ____ |
| 2 / ____ | ____ | CP02 Ground floor corridor | ____ | Y / N | ____ | ____ |
| 3 / ____ | ____ | CP03 Kitchen exit | ____ | Y / N | ____ | ____ |
| 4 / ____ | ____ | CP04 First floor stair | ____ | Y / N | ____ | ____ |
Carry on down the list until every call point has been tested, then start again. Keep the same time slot each week. Log false alarms, faults, disablements and engineer visits in the same book. The call point names above are examples, so list your own.
A failed test is a finding, not a disaster. Write it down and act the same day.
| What you see | What to do |
|---|---|
| Panel does not react to the call point | Record it. Test a second call point. If that also fails, call your alarm engineer and agree interim measures, such as a fire watch, until it is fixed |
| Panel shows the alarm but sounders do not work | Record which sounders. This is a serious defect. Call your engineer and put interim measures in place |
| Panel shows a fault before or after the test | Note the fault text and zone from the panel. Call your engineer. Do not leave it for the next service |
| A zone or device is disabled | Record who disabled it and why. A disablement should be temporary and approved. Make sure it is re-enabled |
| Sounders are too quiet in one area | Record the location. It may need a sound level check or an extra device |
If part of the system is out of action, the responsible person decides what interim measures are needed. That can mean extra patrols, a fire watch or limiting use of the area until it is fixed. Your engineer can advise. If the alarm is going off when it should not, see fire alarm keeps going off.
The responsible person, who may delegate the task.
Under the Regulatory Reform (Fire Safety) Order 2005 the responsible person has to keep fire safety measures, including the alarm, maintained and in good working order (article 17). That is usually the employer, landlord, managing agent or owner. In practice, someone on site is named to run the weekly test. They need training on the panel and a deputy for holidays. The duty stays with the responsible person. See who is the responsible person.
If an inspector, insurer or managing agent asks, this is what they look for.
The logbook is also where the engineer records recommendations. A gap in the weekly tests is the first thing an insurer or auditor will notice. For the standard behind all this, see what is BS 5839.
They are different jobs. One does not replace the other.
| Weekly test | Engineer service | |
|---|---|---|
| Who | A trained person on site | A competent fire alarm engineer |
| How often | Every week | About every 6 months |
| What it checks | One call point, the panel response and the sounders | Detectors, call points, sounders, panel, batteries, cause and effect and cabling, with a share of devices tested each visit |
| Output | A logbook entry | A service report and certificate, with any defects listed |
A fire alarm service visit starts from about £400 + VAT for a small system. For what a visit covers, see fire alarm servicing and maintenance. If you are designing or replacing a system, see commercial fire alarm installation.
Tell them before you test, every time.
If your system is connected to an alarm receiving centre (ARC), a call point test can send a real signal that results in a call to the fire service. Phone the ARC before you start, give your site name and expected test time, and ask them to put the system on test. When you finish, phone them back to take it off test. Note both calls in the logbook. If you are not sure how your system is monitored, ask your provider. See fire alarm monitoring explained.
Do not log it in the fire alarm book.
Emergency lighting has its own monthly flick test and annual full duration test under BS 5266-1, with its own record. Details are on emergency lighting testing requirements.
Updated October 2026 by Sebastian Grabowski, DC Fire & Security, 2 Winsdon Court, Luton LU1 5LZ.
Email the make of panel, the number of floors and the date of the last service to info@dcsecurity.co.uk, or use the form. We usually come back with a fixed price the same day. Luton, Bedfordshire, Hertfordshire, Buckinghamshire and London.
Send photos for a fixed price · No obligation · Response within 24 hours