Strictly, a fire risk assessment doesn't fail — it produces an action plan with priorities, and 'failed' just means yours came back long. What matters now: work the plan in priority order and keep dated evidence of every item closed. Typical remedial money: fire door work £250–£1,500 a door, fire stopping £650 a day, alarm upgrades from £2,600, a fresh FRA £650. Enforcement only bites when reports sit ignored.
The Fire Safety Order 2005 makes the responsible person — employer, building owner, landlord of the common parts — carry out a suitable assessment and then act on its significant findings. The assessor's output is an action plan, usually rated high/medium/low or with timescales. A 'failed' FRA is one with a stack of high-priority items, and the legal exposure isn't the list itself: it's the list sitting in a drawer while the dates age.
So the goal isn't a clean sheet by Friday. It's visible, recorded progress in priority order — which is also exactly what a fire authority auditor asks to see.
Most premises never meet it, but it runs: informal advice from the fire authority, then an improvement notice with a compliance date (21 days or more), then — for serious or ignored risk — enforcement and prohibition notices, then prosecution, where fines are unlimited and individuals can carry liability. Audits get triggered by complaints, incidents, licensing visits and, in residential blocks, the paper trail the 2022 regulations now generate every quarter.
Every rung of that ladder is answered the same way: the plan, the invoices, the dates. An auditor who sees high-priority items closed within weeks and a programme for the rest almost always leaves it at advice.
The usual suspects on an FRA action plan, at our standard retail rates, +VAT:
| Action plan item | What it involves | Price (+VAT) |
|---|---|---|
| Fire door remedials | Seals, closers, gaps, hardware — per door | £250–£350 |
| Fire door replacement | New FD30S doorset, supplied and fitted | £1,350–£1,500 |
| Fire stopping | Sealing service penetrations, compartment lines, riser breaches | £650/day |
| Alarm panel replacement | Obsolete or unserviceable panel renewed, recommissioned | From £2,600 |
| New alarm system, small commercial | Design, install, commission, certificate | From £4,250 |
| Emergency lighting works | Per the action plan — see our cost guide | Priced per schedule |
| Fresh or review fire risk assessment | Commercial premises / small residential block | £650 / £175 |
FRA action plans sprawl across trades — doors, compartmentation, alarms, lighting — and chasing four contractors is how items stay open for a year. We deliver the passive and active items as one programme: one schedule, one evidence pack keyed to the FRA's numbering, one point of blame if a date slips. Recent work in exactly this shape includes fire-stopping programmes on a hospital site and door remediation across school estates.
If the plan includes items we don't self-deliver, we say so and sequence around them rather than absorbing them badly.
If you're reading this because a landlord, insurer or licensing officer asked for an FRA you don't have: virtually every non-domestic premises and the common parts of every block of flats legally needs one, reviewed regularly. £650 for commercial premises, £175 for a small residential block, delivered as a written report with the action plan structured the way this page assumes. What the types mean and how to choose an assessor are both covered in our guides.
Send us the FRA. We price the remedial items line by line — doors, fire stopping, alarms, emergency lighting — and deliver them as one programme with the evidence trail your assessor and insurer want. Luton, Bedfordshire, Hertfordshire and North London.