Yes, if the building has several floors, flats or tenants, has been altered, or comes with no fire strategy or compartmentation records. You inherit its fire protection problems when you buy it, and a survey puts a cost on them before you commit. A single-storey unit with full records may need only a review of its fire risk assessment.
By Sebastian Grabowski, DC Fire & Security, Luton. Updated November 2026.
Once you own or control a building you will usually be the responsible person under the Fire Safety Order. Article 3 makes the responsible person the employer for a workplace, the person in control of other business premises, or the owner where nobody else is in control. Article 17 requires the fire protection in the building to be kept in efficient working order and good repair. A breach in a compartment wall is a defect you now own.
A survey before contracts are signed gives you three things. It tells you what the problem is, which you cannot see from a viewing. It gives you a defect list you can price with a fire stopping contractor, so the number is real. And it gives you something to put to the seller: a price reduction, a retention, a warranty or an agreement that they fix it before completion.
A compartmentation survey inspects the fire-resisting walls, floors, risers and ceiling voids that are meant to contain a fire and smoke, and records every breach with a photo and a location on the plans.
| What is checked | Why it matters to a buyer |
|---|---|
| Walls between units and tenancies | A breach affects every neighbour and is hard to blame on one tenant |
| Risers and service shafts | Missing seals at floor level let fire and smoke travel the height of the building |
| Ceiling voids | Walls often stop at the ceiling tile, with nothing above to the slab |
| Penetrations by later services | Cabling and pipework add holes after handover |
| Doors in compartment lines | Fire doors are part of the barrier and can fail it |
| Existing fire stopping | Whether tested systems were used and whether any record exists |
The report is a defect schedule with photos and plan references, in a priority order you can price.
An intrusive survey opens up ceilings and boxing, and needs the seller's permission and access. Ask early. A non-intrusive survey can sometimes be done on a viewing with access to risers and plant rooms. We can start with a non-intrusive survey and extend to an intrusive investigation if the first findings call for it.
Leave time for the survey and for pricing the repairs before your decision date, and ask what the defect schedule will contain before you book, because a survey with no schedule gives you nothing to negotiate with.
For the basics of how compartments work, see fire compartmentation explained.
A compartmentation survey is priced per job, from the plans. Cost is set by the number of cores and storeys, the number of compartment areas, how much opening up is needed, and whether the building is occupied. We do not price per floor or per unit, because the same number of floors can hold very different amounts of work. Send the drawings or the address and we confirm a price and date.
Surveys are paid for when booked, and the date is confirmed once the payment clears.